Sleeper Wall Builders

Sleeper Wall Builders

Concrete Sleeper Walls

Long-lasting concrete sleepers in plain or wood-effect finish, slotted between steel or concrete posts for strong, low-maintenance walls.

Free Sleeper Wall Builders quote

No obligation. We only use your details to reply about this job.

Concrete Sleeper Walls — Sleeper Wall Builders

What's involved

Concrete sleepers will not rot, making them a good choice for retaining walls in permanently damp ground or where a long life matters. The system uses steel H-section or concrete posts set in concrete footings, with concrete sleepers slid down between the flanges. Posts are spaced exactly to suit the sleeper length, usually around two metres, so the setting out has to be accurate. Many concrete sleepers have a wood-grain finish, and some are available in grey, brown or charcoal. They are much heavier than timber, so installers may use lifting tools or a small digger. Drainage gravel and a membrane go behind as with timber walls. Concrete sleepers can retain more soil than timber and are popular for boundary walls and driveway edges. A typical wall takes two to four days.

How we handle it

  1. Tell us your plans

    Use the quote form to describe the wall, beds or steps you want, the length and height, the soil and what the sleepers are for. Photos of the area and any slope help the landscaper price quickly.

  2. Site visit

    A local landscaper checks levels, soil, drainage and access, and talks through sleeper types: treated softwood, oak or concrete. They confirm whether the height needs extra posts or an engineered approach.

  3. Fixed quote

    You receive one price covering sleepers, posts, concrete, fixings, membrane, drainage, labour and removal of spoil. The quote lists the sleeper size and type so you know exactly what you are getting.

  4. Build

    Ground is dug out, posts set in concrete, sleepers cut, laid and screwed in place, and membrane and drainage added behind. Most domestic sleeper projects take one to four days.

  5. Backfill and tidy

    Soil or topsoil is backfilled and levelled, cut ends treated with preservative, and waste removed. The landscaper explains how to look after the timber and keep drainage clear.

Price guide

Sleeper walls are usually priced per linear metre or per project, based on the height, sleeper type and amount of digging. New treated softwood is the cheapest, oak costs more, and concrete sleeper systems sit at the top. Groundwork and access make a big difference. These are typical UK guide prices for 2026, including materials and labour.

  • Concrete sleeper wall with steel posts: £250–£450 per metre. Per linear metre for walls around 600mm to 1m high in plain or wood-effect concrete.
  • Sleeper raised bed: £250–£550. Per bed of around 2.4m by 1.2m, two to three sleepers high, lined and fixed.
  • Sleeper steps: £120–£220 per step. Per step including riser, fixing, compacted base and gravel or bark tread.

Questions about concrete sleeper walls

How much does a sleeper wall cost in the UK?

A softwood sleeper retaining wall around three sleepers high usually costs £180 to £300 per linear metre, including posts, concrete, membrane and labour. Oak walls cost roughly £260 to £420 per metre. Concrete sleeper systems cost around £250 to £450 per metre.

How high can a sleeper retaining wall be?

Timber sleeper walls work best up to about a metre high. Beyond that, soil pressure rises quickly and the wall needs deeper posts, closer spacing and often an engineer's input. For taller walls, concrete sleepers with steel posts or a masonry wall are usually a better choice.

How long do timber sleeper walls last?

New pressure-treated softwood sleepers typically last 10 to 15 years in contact with soil, longer if lined with a membrane and well drained. Oak sleepers can last 20 years or more. Concrete sleepers do not rot and last much longer.

Get a free sleeper wall builders quote

Tell us what you need and we'll come back with a clear price.

Request a quote