Sleeper Wall Builders glossary
The terms you'll come across, explained in plain English.
- Backfill
- Material placed behind a wall once it is built. Clean angular gravel drains freely and reduces pressure; clay backfill holds water and pushes the wall forward.
- Geotextile membrane
- A permeable fabric placed between soil and the back of a wall. It lets water through to the drainage while stopping fine soil washing between the sleepers.
- Green oak
- Freshly sawn oak that has not been dried. It is cheaper than seasoned oak and moves slightly as it dries, often opening harmless surface splits.
- H-section post
- A galvanised steel post shaped like the letter H in cross-section. Concrete sleepers slide down between its flanges to form a wall.
- Hydrostatic pressure
- The pressure that builds up when water collects behind a wall. It can be greater than the soil itself and is a major cause of retaining wall failure.
- Perforated land drain
- Flexible plastic pipe with small slots, laid in gravel at the base of a retaining wall to collect water and carry it away to an outlet or soakaway.
- Postcrete
- A fast-setting dry concrete mix poured into post holes and wetted in place. It sets in minutes, letting posts be fixed the same day.
- Pressure treatment
- A process where preservative is forced deep into softwood under pressure in a sealed vessel, protecting it against rot and insects for longer than brushing on.
- Retained height
- The height of soil a wall holds back, measured from the lower ground level to the higher one. It decides post depth, sleeper size and whether an engineer is needed.
- Retaining wall
- A wall built to hold back soil where the ground level on one side is higher than the other, such as along a sloping garden or terrace.
- Shakes
- Splits that appear along the grain of timber, especially oak, as it dries. Surface shakes are normal and rarely affect the strength of a sleeper.
- Sleeper
- A heavy rectangular length of timber or concrete, typically about 2.4 metres long, used in gardens to build walls, raised beds, steps and edging.
- Structural timber screw
- A long, high-strength screw, often 200mm or more, designed to fix heavy timbers together without pre-drilling. Used to join sleepers to posts and each other.
- Tannin bleed
- Dark, water-soluble staining that runs out of new oak when wet. It can mark pale paving and concrete during the first months after installation.
- UC4 treatment
- Use Class 4, the level of preservative treatment intended for timber in contact with the ground or fresh water. Softwood sleepers used in walls should be treated to this class.
- Weep holes
- Small gaps left near the base of a retaining wall so trapped water can escape through the face rather than build up behind it.
Get a free sleeper wall builders quote
Tell us what you need and we'll come back with a clear price.
Request a quote